“Great job!”
“They added a dormer to the back of the house on the second floor which included six new windows. They also enlarged the front upstairs bedroom. They put up a new hallway wall on one side. Rebuilt the stairwell with new railings and banisters. One railing was custom built to be removable. Installed hardwood flooring in the downstairs and upstairs hallways along with base molding and shoe molding. They painted the hallways. The entire roof on the house was replaced.”